01
Site and power assessment
Sites are compared by available grid capacity, connection timeline, tariffs and climate, before land and equipment are committed.
Energy Infrastructure
The growth of AI compute is limited by the availability of power. Aphelium plans the energy infrastructure of new capacity as one system, from the choice of site to operation.
Context
Data center electricity use expected by 2030.
Source: IEA.
New AI compute capacity agreed for Uzbekistan through 2030.
Source: Government of Uzbekistan, 2026.
Scope
01
Sites are compared by available grid capacity, connection timeline, tariffs and climate, before land and equipment are committed.
02
Connection strategy and long-term supply arrangements with grid operators and generators.
03
Solar generation, battery storage and backup power, integrated with the facility load and the grid.
04
Electrical and cooling design for high-density racks, including liquid cooling, specified for the lowest energy cost over the life of the facility.
Process
Power, land, climate
Grid connection, contracts
Solar, batteries, backup
Power and cooling design
Optimization by the Aphelium platform
Decisions on site, supply, generation and cooling fix the energy cost of a facility for decades. Aphelium plans them together and carries the same physical model into operation, where the Aphelium platform optimizes the facility from the first day.