Phase 1
Energy Assessment
A read-only link to the BMS, power meters and temperature sensors, followed by a written report.
Services
Each phase has a defined objective, deliverable and duration. No change is made to operations during the assessment.
| Phase | Objective | Deliverable | Duration |
|---|---|---|---|
| Energy Assessment | Establish the savings potential from a read-only connection. | Report with the savings potential in kWh and financial terms. | Weeks 1–4 |
| Implementation | Integrate with site systems, build the facility model and test it against operating data. | Working integration, validated model, agreed limits and baseline. | Months 2–3 |
| Operation & Support | Continuous optimization inside hard limits. | Monthly report with measured savings. Technical support. | Month 3 onward |
Phase 1
A read-only link to the BMS, power meters and temperature sensors, followed by a written report.
Phase 2
Integration, facility model and testing. Setpoint recommendations are applied by the facility team.
Phase 3
Automatic control inside hard limits, monthly reporting and technical support. Operators can override at any time.
The assessment is the starting point of every engagement.