01
Existing facilities
Software for the optimization of cooling and power systems. Operates on existing infrastructure, within limits defined by the operator, without changes to equipment.
SolutionsEnergy for data centers and AI compute
Aphelium reduces the energy consumption of existing data centers through software for the optimization of cooling and power systems, and plans the energy infrastructure of new AI compute capacity: power, storage and cooling.
Two directions
01
Software for the optimization of cooling and power systems. Operates on existing infrastructure, within limits defined by the operator, without changes to equipment.
Solutions02
Energy infrastructure for AI compute: power availability, grid connection, on-site generation, storage and cooling, planned as one system from the site stage.
Energy InfrastructureThe problem
Data center electricity use expected by 2030.
Manba: IEA.
Cooling energy reduction reported for AI cooling control in production.
New AI compute capacity agreed for Uzbekistan through 2030.
Manba: Government of Uzbekistan, 2026.
How it works
01 Week 1
Read-only link to the BMS, power meters and temperature sensors. Any vendor, old or new.
02 Weeks 2–4
A physical model of the facility: heat loads, airflow, chiller curves, tariffs.
03 Month 2
Setpoint changes, each with the expected kWh saving and the reason. Your team applies them.
04 Month 3+
Automatic control inside hard limits. Operators can override at any time.
Savings estimate
Principles
Works through the controllers and meters you already have, across vendors and equipment ages.
Optimization over a physical model with hard constraints. Every setpoint comes with its reason.
Temperature, humidity and redundancy limits are set by your team and are never traded for savings.
Fees are linked to the measured reduction in energy consumption, verified against an agreed baseline.
By role
Central Asia
Hot summers mean cooling dominates.
Mixed equipment from many vendors and decades.
Tariffs rising and capacity growing fast.
Aphelium conducts a read-only assessment of the facility's cooling and power systems and presents the identified savings potential in kWh and financial terms before any change is made to operations.