Energy Infrastructure

Power, storage and cooling for new AI compute capacity.

The growth of AI compute is limited by the availability of power. Aphelium plans the energy infrastructure of new capacity as one system, from the choice of site to operation.

Context

Demand for power grows faster than the grid.

2×

Data center electricity use expected by 2030.

Manba: IEA.

800 MW

New AI compute capacity agreed for Uzbekistan through 2030.

Manba: Government of Uzbekistan, 2026.

Scope

Four areas, planned together.

01

Site and power assessment

Sites are compared by available grid capacity, connection timeline, tariffs and climate, before land and equipment are committed.

02

Grid connection and supply

Connection strategy and long-term supply arrangements with grid operators and generators.

03

On-site generation and storage

Solar generation, battery storage and backup power, integrated with the facility load and the grid.

04

Power and cooling for AI data halls

Electrical and cooling design for high-density racks, including liquid cooling, specified for the lowest energy cost over the life of the facility.

Process

From site to operation.

  1. Site

    Power, land, climate

  2. Supply

    Grid connection, contracts

  3. Generation and storage

    Solar, batteries, backup

  4. Facility

    Power and cooling design

  5. Operation

    Optimization by the Aphelium platform

01One system

Decisions on site, supply, generation and cooling fix the energy cost of a facility for decades. Aphelium plans them together and carries the same physical model into operation, where the Aphelium platform optimizes the facility from the first day.

02Who Aphelium works with

  • Data center developers
  • Operators expanding capacity
  • Investors in compute and energy assets
  • State programmes for digital infrastructure