Bog'lanish

Services

Services in three phases.

Each phase has a defined objective, deliverable and duration. No change is made to operations during the assessment.

PhaseObjectiveDeliverableDuration
Energy AssessmentEstablish the savings potential from a read-only connection.Report with the savings potential in kWh and financial terms.Weeks 1–4
ImplementationIntegrate with site systems, build the facility model and test it against operating data.Working integration, validated model, agreed limits and baseline.Months 2–3
Operation & SupportContinuous optimization inside hard limits.Monthly report with measured savings. Technical support.Month 3 onward

Phase 1

Energy Assessment

A read-only link to the BMS, power meters and temperature sensors, followed by a written report.

Phase 2

Implementation

Integration, facility model and testing. Setpoint recommendations are applied by the facility team.

Phase 3

Operation & Support

Automatic control inside hard limits, monthly reporting and technical support. Operators can override at any time.

Energy Assessment

The assessment is the starting point of every engagement.